• 1 Select Category

  • 2 Select Product

  • 3 Select Design

1 of 3

Collection: OTF Steel Fabrication - Uniforms

 

Please note that this is a preorder store,
and the estimated lead time for orders is 2-3 weeks.

Minimum Order Quantities: 

To place a bulk order, a minimum of 10 units combined from the items below is needed.
OTF | Bamboo Charcoal Corporate Polo
OTF | Fleecy Hoodie
OTF | Urban Hooded Puffer Jacket

To place a bulk order, a minimum of 5 units is needed.
OTF | Original Cotton Drill Shirt - Long Sleeve
OTF | Chambray Shirt - Long sleeve

• Note: If you see “Ready in 5 days” on the item, please ignore this; it’s an automatic system error we are working to fix. The correct time frame is 2-3 weeks after the bulk order is placed.

Why does it take 2-3 weeks?

To explain clearly, all orders are custom-made after the bulk order is placed. Nothing is produced before that. These are not ‘off-the-shelf’ items; they are made specifically for club members, which is why there is a turnaround time.

Important: Please select Pick Up at checkout to avoid freight charges.